top of page
Phase 1

The project includes plans for

Bowens Mill;

· Steps and handrails for canoe/ kayak landing

 

Park Shelter on Bee Property;

· Steps and handrail

· Installing electrical for two camping sites and parking area

 

Krouskop Park Tennis Court Landing

· Installation of handicap accessible canoe/kayak landing

· Install biker friendly parking rack

· Install handicap ramp to landing

· Install 3 electrical hook ups for 6 campsites and parking base

· Install signage

 

Old Community Center Site

· Installing a handicap assessable canoe/kayak landing

· Installing a handicap fishing pier

· Installing biker friendly parking rack

· Installing a ramp to the landing and connecting to sidewalk/dike trail

· Installing 3 Electrical hook ups for 6 Camp Sites and parking base

· Preparation of Primitive camping area

· Installing signage

 

Additional Plans

 

Bohmann Drive Canoe Kayak Landing

· Installing of steps and walk from Bohmann Drive R.O.W to cayak Landing

· Installing signage

 

County Hwy O/Walmart Landing

· Installing of steps and Hand rail from County O R.O.W. to canoe/kayak landing

· Installing Entry gate

· Installing a canoe/ kayak landing

· Installing signage

 

Paving of City Owned Bike Trail from Bohmann Drive to Cty Hwy O

· Prep and Installation of 8’ wide asphalt path

· Installation of security lighting

· Installing signage

 

Peebles Drive/East Street

· Development of Hiking/ Bike trails (City Property)

· Preparation and construction of mountain/fat bike trails/race course

· Preparation of hiking/snowshoeing trails

· Installing signage

 

bottom of page